Case Study

 
Mini Wiring Cabinet

Uppingham School

Uppingham School Entrance

 

This case study is based on an interview with Uppingham School.

 

The original Uppingham school was founded as a grammar school in 1584 by Archdeacon Robert Johnson.

 

In 1853 Edward Thring transformed it into one of England's foremost schools and established a tradition of innovation which continues today.

 

Since that time, it has grown and expanded and now covers 39 buildings. They present for more diversity in architectural design than is normally to be found in a school -a diversity which also reflects the character of Uppingham.

 

Uppingham SchoolWith the development of the National Curriculum and the government's push for all children in education to have access to computers and the internet, Uppingham School decided that they wished to upgrade their existing systems to a more state of the art, fully networked system.

 

The project was outlined briefly in documents drawn up by Uppingham and presented to various contractors before a decision was made on whom to award the contract.

 

Connectus were awarded the contract because of our experience in installing fibre optic cables, category 5 and 5E cabling and of course our competitive pricing.

 

Connectus designed and implemented a solution for Uppingham School which covered all 39 school buildings spread over the town of Uppingham. The scheme of work had to take into account the listed nature of the buildings.

 

Small Distibution Wiring Cabinet

 

The solution consisted of various aspects including :

  • A ducting system to connect all the remote building with a total length of two Kilometres
  • Seven Intel Gigabit Switches connected via Singlemode Fibre Optic cabling on a Gigabit backbone.
  • The thirty nine buildings connected via 100Mb fibre
  • Thirteen hundred Category 5 Enhanced points wired in to the buildings.

Distribution Wiring Cabinet

 

Statistics of interest :


The total length of fibre optic cable used was 8000m of various cores. This is equivalent to approximately 30 miles if all the cores are laid end to end.

 

The total length of Category 5 Enhanced cable used was 78000m. This is equivalent to approximately 365 miles if all the cores are laid end to end.

 

The project was estimated to take 8 months. It was finished 2 months early.

 

Work StationsOn the hardware side, eight P3 450MHz servers running various applications were installed. Some of the servers had multiple Intel twin network cards that had Teaming set to give a high bandwidth access to the network.

 

A large number of PC's were also supplied to replace Uppingham Schools older machines.

 

The software was installed and all the schools existing databases were migrated to the new machines.

 

 

If you have a project you would like us to quote on please call us on :

(01788) 824775

 

 

Fibre Optic Cables

 

 

 

 

 

 

Single Face Plate Fully Loaded

© Copyright Connectus Ltd. All Rights Reserved

Connectus Ltd., Eldon House, Eldon Way, Crick Industrial Estate, Crick, Northants., NN6 7SL

W3C CSS Validation
Web Design : Andre Anthony

Valid HTML 4.01!